Conway, SC 29526
- 5Beds
- 2Full Baths
- 1Half Baths
- 2,400SqFt
- 2014Year Built
- 0.31Acres
- MLS# 2209796
- Residential
- Detached
- Sold
- Approx Time on Market1 month, 3 days
- AreaConway To Myrtle Beach Area--Between 90 & Waterway Redhill/grande Dunes
- CountyHorry
- Subdivision Hillsborough
Overview
This charming house offers four bedrooms, a bonus room, and two and a half baths, located on a pond and in a Cul-de-sac in the popular Hillsborough community. Tile, wood, and carpet cover the floors. The kitchen boasts granite counters, stainless steel appliances, staggered cabinets, backsplash, a pantry, breakfast nook and bar. The spacious living room has vaulted ceilings, a ceiling fan, and sliders to the screened in porch. The private primary bedroom has tray ceiling with ceiling fan, an accent wall, and wonderful views of the backyard and pond through a large picture window. The private primary bath has two sinks, a garden tub, stand up shower, and walk in closet. The split bedroom floorplan gives you one room in the front of the house with a half bath. The other two bedrooms and second full bath are off the living room through a pocket door and towards the rear on the house. The bonus room, above the two-car garage, is accessible through the laundry/mud room and up the stairs. In the sizable fenced in backyard enjoy the screened in porch, retractable awning over the patio, beautiful landscaping, and wonderful views of the pond. Hillsborough community offers an outdoor pool, clubhouse, playground, and is located close to shopping, dining, entertainment, and minutes to the beach. Square footage is approximate and not guaranteed, buyer is responsible for verification.
Sale Info
Listing Date: 05-05-2022
Sold Date: 06-09-2022
Aprox Days on Market: 
1 month(s), 3 day(s)
Listing Sold: 
3 Year(s), 2 month(s), 18 day(s) ago
Asking Price: $400,000
Selling Price: $410,700
Price Difference:
Increase $10,700
Agriculture / Farm
Grazing Permits Blm: ,No,
Horse: No
Grazing Permits Forest Service: ,No,
Grazing Permits Private: ,No,
Irrigation Water Rights: ,No,
Farm Credit Service Incl: ,No,
Crops Included: ,No,
Association Fees / Info
Hoa Frequency: Monthly
Hoa Fees: 118
Hoa: 1
Hoa Includes: AssociationManagement, CommonAreas, CableTV, LegalAccounting, Pools, Trash
Community Features: Clubhouse, RecreationArea, LongTermRentalAllowed, Pool
Assoc Amenities: Clubhouse, OwnerAllowedMotorcycle
Bathroom Info
Total Baths: 3.00
Halfbaths: 1
Fullbaths: 2
Bedroom Info
Beds: 5
Building Info
New Construction: No
Levels: OneandOneHalf
Year Built: 2014
Mobile Home Remains: ,No,
Zoning: PUD
Style: Traditional
Construction Materials: VinylSiding
Buyer Compensation
Exterior Features
Spa: No
Patio and Porch Features: RearPorch, FrontPorch, Patio, Porch, Screened
Pool Features: Community, OutdoorPool
Foundation: Slab
Exterior Features: Fence, Porch, Patio
Financial
Lease Renewal Option: ,No,
Garage / Parking
Parking Capacity: 4
Garage: Yes
Carport: No
Parking Type: Attached, Garage, TwoCarGarage, GarageDoorOpener
Open Parking: No
Attached Garage: Yes
Garage Spaces: 2
Green / Env Info
Interior Features
Floor Cover: Carpet, Tile, Wood
Door Features: StormDoors
Fireplace: No
Laundry Features: WasherHookup
Furnished: Unfurnished
Interior Features: SplitBedrooms, WindowTreatments, BreakfastBar, BedroomonMainLevel, BreakfastArea, EntranceFoyer, StainlessSteelAppliances, SolidSurfaceCounters
Appliances: Dishwasher, Disposal, Microwave, Range, Refrigerator, Dryer, Washer
Lot Info
Lease Considered: ,No,
Lease Assignable: ,No,
Acres: 0.31
Land Lease: No
Lot Description: CulDeSac, IrregularLot, LakeFront, OutsideCityLimits, Pond
Misc
Pool Private: No
Offer Compensation
Other School Info
Property Info
County: Horry
View: No
Senior Community: No
Stipulation of Sale: None
Property Sub Type Additional: Detached
Property Attached: No
Security Features: SmokeDetectors
Disclosures: CovenantsRestrictionsDisclosure
Rent Control: No
Construction: Resale
Room Info
Basement: ,No,
Sold Info
Sold Date: 2022-06-09T00:00:00
Sqft Info
Building Sqft: 2500
Living Area Source: PublicRecords
Sqft: 2400
Tax Info
Unit Info
Utilities / Hvac
Heating: Central, Electric
Cooling: CentralAir
Electric On Property: No
Cooling: Yes
Utilities Available: CableAvailable, ElectricityAvailable, PhoneAvailable, SewerAvailable, UndergroundUtilities, WaterAvailable
Heating: Yes
Water Source: Public
Waterfront / Water
Waterfront: Yes
Waterfront Features: Pond
Directions
From HWY 90 turn in to Hillsborough on Hillsborough Dr. Turn right on Hopscotch Ln, Turn right on White Fox Ct and house is on left in Cul-de-sac.Courtesy of Brg Real Estate